Clackamas ESD
PROJECT SCOPE
Baldwin General Contracting undertook a comprehensive scope of work for the Clackamas Education Service District (CESD) Early Childhood Center. 21,000-square-foot project.
The project encompassed tenant improvements involving selective demolition, structural concrete, targeted seismic strengthening, and wood framing. Interior enhancements included plastic laminate casework and wall paneling, insulation, drywall, acoustical ceilings, resilient and resinous flooring, carpet tiles, and fabric-wrapped panels. Specialty installations comprised food service equipment, walk-in cold storage, appliances, play equipment with surfacing, and a hydraulic elevator. Building systems work involved fire sprinklers, domestic plumbing, hydronic piping systems, electrical, video surveillance, fiber optics and data, paging system, access control, and fire alarm. Exterior work included earthwork, underground utilities, asphalt concrete paving, synthetic grass surfacing, fencing, landscaping, and irrigation.
PROJECT DETAILS
Category: Education
Location: Clackamas, OR
Sq. Ft.: 21,000












