NCSD Bus Barn

PROJECT SCOPE

North Clackamas School District
Ground-up construction of Transportation Fleet operations campus, maintenance shop, and administrative offices.

  • 12,120 square feet vertical construction
  • Slab on grade, heavy section, pre-engineered metal building with wide flange post & beam, concrete on metal deck mezzanines
  • Decorative CMU, architectural metal soffites, trim and wall panel exterior cladding
  • 4.5 acres of site improvements including curb/gutter, AC parking lots, ramps & walks, pedestrian, and landscape amenities
  • Interior build-out includes air/fluids distribution piping & hose management systems, truck lifts, exhaust evac system, wash equip

PROJECT DETAILS

Category:  Public Works 

Location:  Clackamas, OR

Sq. Ft.:  12,120

Westridge LoftsWestridge Lofts
Natural Point

RELATED PROJECTS